Dekorationsartikel gehören nicht zum Leistungsumfang.
Sprache:
Englisch
90,30 €*
Versandkostenfrei per Post / DHL
Lieferzeit 1-2 Wochen
Kategorien:
Beschreibung
This unique reference interweaves information on the three major overlapping parts of the total project program: programs (defined as techniques, procedures, and methods), people skills (defined as experience, application, and analytical ability), and the culture of project groups (defined as project commitment and working togetherness). Summarizing the skills necessary for an economic construction program, Effective Project Management Through Applied Cost and Schedule Control presents a detailed evaluation of current project skill levels...reveals a direct correlation between project team-building and cost/schedule control...offers rules of thumb for establishing and developing the scope of a project...suggests value management procedures for creating cost-effective construction designs...delineates a wide range of analytical trending techniques...covers change control and risk analysis...elucidates the procurement needs of a project...and more.
This unique reference interweaves information on the three major overlapping parts of the total project program: programs (defined as techniques, procedures, and methods), people skills (defined as experience, application, and analytical ability), and the culture of project groups (defined as project commitment and working togetherness). Summarizing the skills necessary for an economic construction program, Effective Project Management Through Applied Cost and Schedule Control presents a detailed evaluation of current project skill levels...reveals a direct correlation between project team-building and cost/schedule control...offers rules of thumb for establishing and developing the scope of a project...suggests value management procedures for creating cost-effective construction designs...delineates a wide range of analytical trending techniques...covers change control and risk analysis...elucidates the procurement needs of a project...and more.
Über den Autor
Bent, James; Humphreys, Kenneth K.
Inhaltsverzeichnis
The relationship and impact of project skills: introduction and authors' mission statement; benchmarking - the technical core of TQM; the impact of personnel skills on company culture and bottom line. Cosy and schedule baselines: estimating keys - establishing a realistic baseline (typical and standard schedules); value management; economic evaluation in the process industries; keys to controlling and reducing environmental costs. Project control: contracting - front-end risks (key contract administration and cost-schedule considerations); cost and schedule trend analysis-forecasting of baselines; change control and risk analysis; range estimating; contracting - claims and extras (excluding genuine scope changes); managing small, shutdown, retrofit, or outrage projects; project closeout-lessons learned and historical data. Project management keys and interface: project management fundamentals - key elements; managing the feasibility study - pre-project planning; front-end planning and project organization (FEPPO); managing engineering-project control keys/interfaces; management procurement - project control keys/interfaces; managing construction-project control keys/interfaces.
Details
Erscheinungsjahr: | 2019 |
---|---|
Fachbereich: | Allgemeines |
Genre: | Wirtschaft |
Rubrik: | Recht & Wirtschaft |
Medium: | Taschenbuch |
Inhalt: | Einband - flex.(Paperback) |
ISBN-13: | 9780367401344 |
ISBN-10: | 0367401347 |
Sprache: | Englisch |
Einband: | Kartoniert / Broschiert |
Autor: |
Bent, James
Humphreys, Kenneth K. |
Hersteller: | Taylor & Francis Ltd |
Maße: | 216 x 279 x 31 mm |
Von/Mit: | James Bent (u. a.) |
Erscheinungsdatum: | 23.09.2019 |
Gewicht: | 1,204 kg |
Über den Autor
Bent, James; Humphreys, Kenneth K.
Inhaltsverzeichnis
The relationship and impact of project skills: introduction and authors' mission statement; benchmarking - the technical core of TQM; the impact of personnel skills on company culture and bottom line. Cosy and schedule baselines: estimating keys - establishing a realistic baseline (typical and standard schedules); value management; economic evaluation in the process industries; keys to controlling and reducing environmental costs. Project control: contracting - front-end risks (key contract administration and cost-schedule considerations); cost and schedule trend analysis-forecasting of baselines; change control and risk analysis; range estimating; contracting - claims and extras (excluding genuine scope changes); managing small, shutdown, retrofit, or outrage projects; project closeout-lessons learned and historical data. Project management keys and interface: project management fundamentals - key elements; managing the feasibility study - pre-project planning; front-end planning and project organization (FEPPO); managing engineering-project control keys/interfaces; management procurement - project control keys/interfaces; managing construction-project control keys/interfaces.
Details
Erscheinungsjahr: | 2019 |
---|---|
Fachbereich: | Allgemeines |
Genre: | Wirtschaft |
Rubrik: | Recht & Wirtschaft |
Medium: | Taschenbuch |
Inhalt: | Einband - flex.(Paperback) |
ISBN-13: | 9780367401344 |
ISBN-10: | 0367401347 |
Sprache: | Englisch |
Einband: | Kartoniert / Broschiert |
Autor: |
Bent, James
Humphreys, Kenneth K. |
Hersteller: | Taylor & Francis Ltd |
Maße: | 216 x 279 x 31 mm |
Von/Mit: | James Bent (u. a.) |
Erscheinungsdatum: | 23.09.2019 |
Gewicht: | 1,204 kg |
Warnhinweis